Day 3 - Columns and Slabs

The plan was to have a late breakfast and then a short morning working on one or two little jobs. Things didn’t quite go according to plan though; the one or two short jobs taking considerably longer than planned and when it was time to go to lunch there was still half a tonne of concrete on the floor and nowhere for it to go – yet! The boys worked very hard to keep the concrete live, the shuttering was finally laid and the concrete manhandled into place only one hour late.
The scale of the project began to dawn on them when they realised that all that hard work only concreted about 5% of the total area required and I’m probably being generous.

Did I mention that 5 boys joined Mr White and Mr Griffiths and ran the 8km from the hotel to the orphanage. Your narrator arrived in more leisurely fashion with the boys a little later. I get the impression that this won’t be the last time they run and more may volunteer.
In the afternoon we visited the USA River Academy, a local boarding school where 16 of the children from the orphanage are students on sponsored places. The boys had the most amazing experience; the children were so friendly and two hours passed by in moments as we went on a tour of the grounds. Everywhere we went the children followed us, played with us and were eager to use everyone’s camera. Within 30 seconds of leaving the bus the boys had all had their cameras wrenched from their hands. It was wonderful to see everyone enjoying themselves so much, not only the students but the Harrow boys too, many of whom had a child on their shoulders for most of the afternoon.

In the end our departure was delayed as we had to remove 20 small children who had decided to jump on the bus with us.

Saturday, 10 July 2010

Day 2 - Ground Works

A very physical day with several distinct areas of work.


1. Trench for supply pipe from borehole.

The boys needed to dig a 25m trench 60cm deep to conceal the water pipe and supply cables from the solar panels. Most of the trench was quickly dug in the morning but the afternoon was spent fighting against a few stubborn pieces of buried concrete with a pick axe. The boys took it in turn to fight their way through (1st Photo)

2. Digging down the courtyard to allow for drainage.
The courtyard is mostly flat at the moment and needs to be concreted on a slight slope to allow for drainage. A large team of boys spent the whole day lowering the level and one end of the courtyard and removing the debris. It was a long process but enjoyed some afternoon shade to ease the working conditions.

3. Support column for water tank.

A column of breeze blocks and concrete is needed to support one corner of the water tank, the rest of the support being provided by the existing walls. A small team of boys were tasked to build this up around the steel reinforcements put up the previous day. This was slow going but the resulting column was straight and true. Expert training was provided by a local builder who showed the boys all the tricks of his trade.

4. Painting the dining room roof.

Many of the internal walls need painting. A few people began this process today – they were certainly the messiest of the boys on the bus when we left the orphanage.

5. Foundations for second column.

As the first column rose it worries developed that the existing walls would not be able to support the weight of the water tanks (9 tons when full). After much head scratching it was decided to build two more columns to help bear the weight. The first stage of this process was to dig and lay a foundation.

6. First stages of plumbing

As many of the water pipes are going to be buried under concrete it was important to layout all the submerged pipes before the concreting could begin. This was done very efficiently by the boys and by the end of the day the shuttering was in place to lay the first slab of concrete tomorrow. As a last task the boys went down to the river to get more water ready for the concrete mixing.

One small group (including your narrator) should not be forgotten who braved the streets of Arusha to pick up a wide range of hardware supplies. It was a fascinating journey, made possible only by the kind loan from Mr Theobald of one of his employees ,Castle, who drove us to our varied destinations.

Friday, 9 July 2010

We're Here!

Day one is over. The boys settled into the hotel with their 3 course lunch and then visited the orphange for the first time. They had a good look around and were then treated to a song and dance show from the girls and boys. Following that we all trekked down to the local stream to help them collect water. The boys all made friends and it was a truly wonderful experience.

Before heading back for dinner they had a good game of football with the children.

Mr Griffiths and Mr Smith had sourced all the major materiel in the two days before we got there and had even dug the foundations for the water tank before we got there. There is plenty more to do over the next few days and we'll all be busy digging for the first day or two.

Photos
  1. Abeku helping to unload the coach.
  2. Arriving at the hotel
  3. Collecting water with the children

Nairobi Airport

We reached Nairobi safely at about 7.40am local time. We had lots of fun and games transferring our luggage from one flight to the other but a very helpful gentleman sorted it all out for us and I've now got time to write this little comment whilst I still have internet access.

Hopefully more to follow this evening if the hotel has a decent (or even barely working) internet connection; reports on this matter are mixed.

Tuesday, 29 June 2010

9 Days to go

Excitement is mounting as the day of departure draws near. Most of the boys are still in school but only time will tell if everyone makes it to Heathrow on 8th July. Fingers crossed. We've got quite a challenge ahead of us, installing a pump, solar panels, water tank and plumbing to provide 20,000L of water a day if needs be for the orphanage and local community. Not forgetting the concreting, painting and guttering that we plan to do. We'll certainly all be kept busy.